This is one of the seven completed panels...why does it look so bad?
It hasn't yet been cleaned or patina'ed. I've placed it on 1" foam strips and blocks because its got a 3/4" reinforcement strip on the back of the panel. This runs up the center diagonal of the panel and will keep it from sagging, but for now it keeps the panel from lying flat on the table.
The panels will hang flat so gravity will be trying to pull the glass down. This extra strip will keep it rigid.
So, with 7 of the panels complete (4 delivered this week) I only have one to go. This is an especially gratifying job because it will go somewhere that it will be seen! Station 22 is a restaurant located in the historic Provo Town Square (22 Center St Provo, UT 84601). One of the skylights is in the restaurant and one is west in the walk through between the front and the back of the complex.
We'll be adding a few more pictures of this project as it gets installed. Visit us at www.gsg-art.com I've changed things around a bit to help navigation to be easier. Let me know what you think.
We Love Stained Glass! David Gomm started building stained glass windows in 1983 and soon convinced Jeanne to join him in the art. They have become experts at many aspects of stained glass building, design and repair. Their website www.gsg-art.com has many tips and articles about stained glass, art in general and creativity.
Showing posts with label Architectural Stained Glass. Show all posts
Showing posts with label Architectural Stained Glass. Show all posts
Thursday, August 25, 2016
Seven Down, One To Go!
This is one of the seven completed panels...why does it look so bad?
It has yet been cleaned or patina'ed. I've placed it on 1" foam strips and blocks because its got a 3/4" reinforcement strip on the back of the panel. This runs up the center diagonal of the panel and will keep it from sagging.
The panels will hang flat so gravity will be trying to pull the glass down. This extra strip will keep it rigid.
So, with 7 of the panels complete (4 delivered this week) I only have one to go. This is an especially gratifying job because it will go somewhere that it will be seen! Station 22 is a restaurant located in the historic Provo Town Square. One of the skylights is in the restaurant and one is west in the walk through between the front and the back of the complex.
We'll be adding a few more pictures of this project as it gets installed. Visit us at www.gsg-art.com I've changed things around a bit to help navigation to be easier. Let me know what you think.
It has yet been cleaned or patina'ed. I've placed it on 1" foam strips and blocks because its got a 3/4" reinforcement strip on the back of the panel. This runs up the center diagonal of the panel and will keep it from sagging.
The panels will hang flat so gravity will be trying to pull the glass down. This extra strip will keep it rigid.
So, with 7 of the panels complete (4 delivered this week) I only have one to go. This is an especially gratifying job because it will go somewhere that it will be seen! Station 22 is a restaurant located in the historic Provo Town Square. One of the skylights is in the restaurant and one is west in the walk through between the front and the back of the complex.
We'll be adding a few more pictures of this project as it gets installed. Visit us at www.gsg-art.com I've changed things around a bit to help navigation to be easier. Let me know what you think.
Friday, August 19, 2016
Building some skylights
.
.
.
.
.
.
.
.
Here are three panels that hang in the Station 22 restaurant in the historic Downtown Provo Square. We provided a design for them and have been working on them all week. There are a total of 8 panels (32 square feet) that will go into 2 skylights.
They are looking very nice and I'll show them in another post.
Thursday, March 13, 2014
Hanging Glass
Here we are at the Jewelry Studio in Sugar House. I had to put hooks in a wood stringer over the window so we could hang some of the glass in the window.
We'll be at Brittany Golden Studio in Sugar House Friday night from 6 to 9 and our work will hang through March.
Find directions to her studio at http://www.mentorwithbrittany.com/contactcustom-orders.html
Tuesday, October 08, 2013
Great Fun with Stained Glass
I posted a Youtube video and recently re-posted it with higher resolution and I did the anti-shake option so it's easier to watch.
https://www.youtube.com/watch?v=HSRkmtQUPcs
This year has been one of great success so far. We finished "The Dance Of Life" and did some panels for a designer in Salt Lake.
Here is a view of those windows from inside her design studio. They are very big, we had Glass Doctor in Springville install them. Candace says the only problem with them is that they get so much attention that her clients can't take their eyes off of them to look at items in the design studio!
Then, Candace had us build a Grand Entry for a home north of the capital in Salt Lake City. Never one to make things easy for us, we had to have it built and installed in a month!
It turned out great!
We are currently frantically finishing up 6 more smaller projects so we can build Christmas gift type items.
We have nearly finished teaching the Living Social Star classes we had scheduled and the Amazon local ones will expire in November so that constant barrage of classes will come to an end.!
We couldn't be happier with the way things are going!
https://www.youtube.com/watch?v=HSRkmtQUPcs
This year has been one of great success so far. We finished "The Dance Of Life" and did some panels for a designer in Salt Lake.
Here is a view of those windows from inside her design studio. They are very big, we had Glass Doctor in Springville install them. Candace says the only problem with them is that they get so much attention that her clients can't take their eyes off of them to look at items in the design studio!
Then, Candace had us build a Grand Entry for a home north of the capital in Salt Lake City. Never one to make things easy for us, we had to have it built and installed in a month!
It turned out great!
We are currently frantically finishing up 6 more smaller projects so we can build Christmas gift type items.
We have nearly finished teaching the Living Social Star classes we had scheduled and the Amazon local ones will expire in November so that constant barrage of classes will come to an end.!
We couldn't be happier with the way things are going!
Wednesday, June 05, 2013
First Install North Of Capital Went Well
So we all get in the act, David, Christopher and Landon up 20 feet in the air installing 2 of the five panels.
It surprised me that it took closer to two hours to put the five panels in place. I had estimated 1 hour. But oh, doesn't it look nice?
It surprised me that it took closer to two hours to put the five panels in place. I had estimated 1 hour. But oh, doesn't it look nice?
Friday, May 10, 2013
Today, Dane came with me to help make patterns for a huge entryway. Dane doesn't get out often due to his injuries, but he has great upper body strength and is very good with heights. So this was perfect since we had to do 17 tracings of panels..up off of the ground.
The paper patterns took nearly an hour and it took an hour each way to get there, but that was a well spent three hours. Dane insisted that Jeanne needed to go with us and it turned out that she was able to cut patterns to size as we fit them. She and I moved the scaffold several times, taking Dane for a ride. It was a pretty good adventure..we still don't have an approval on the design that we're working on but it looks like a pretty sure thing that we'll get this job. Now if they didn't need it completed by the end of June!
The pattern was drawn using AutoCAD and as we put the pieces in place most were right on, but several were off by a considerable margin. This is why we do it on paper before doing it in glass.
The paper patterns took nearly an hour and it took an hour each way to get there, but that was a well spent three hours. Dane insisted that Jeanne needed to go with us and it turned out that she was able to cut patterns to size as we fit them. She and I moved the scaffold several times, taking Dane for a ride. It was a pretty good adventure..we still don't have an approval on the design that we're working on but it looks like a pretty sure thing that we'll get this job. Now if they didn't need it completed by the end of June!
The pattern was drawn using AutoCAD and as we put the pieces in place most were right on, but several were off by a considerable margin. This is why we do it on paper before doing it in glass.
Monday, March 04, 2013
Project Is Complete!
When we started, the project was called "Reach" but as it evolved and the symbolism was explored and expanded, Jeanne renamed it. It's now "Dance Of Life."
We went last Tuesday and put the two corner panels in place. You cane see all the panels as Christopher and I install molding around each of the panels.
This is new for us, we've never installed molding before. Usually the client who may need molding has a carpenter on site, but in this case, Fred depended on us for the entire installation. I picked up 1-1/2" x 3/4" wood strips at Home Depot and stained them several days before the install. There was one place where one of the panels had slid down from their original placement before the caulking dried, so we added an extra strip of molding to fully cover the gap and it looked just like we wanted it, perfect!
We started building the stained glass back in June, so total time on the project was 9 months, but we did have to take time in between panels to complete other work.
We went last Tuesday and put the two corner panels in place. You cane see all the panels as Christopher and I install molding around each of the panels.
This is new for us, we've never installed molding before. Usually the client who may need molding has a carpenter on site, but in this case, Fred depended on us for the entire installation. I picked up 1-1/2" x 3/4" wood strips at Home Depot and stained them several days before the install. There was one place where one of the panels had slid down from their original placement before the caulking dried, so we added an extra strip of molding to fully cover the gap and it looked just like we wanted it, perfect!
We started building the stained glass back in June, so total time on the project was 9 months, but we did have to take time in between panels to complete other work.
Tuesday, September 04, 2012
The "Reach" project continues
Here's a large photo of the first installed panel. I plan to finish soldering the front side of the second panel this weekend and get the second side done by labor day.
We made some errors in judgement on this second panel. We wanted to reuse the pattern pieces, which was okay, but we reused the paper pattern by turning it over. By doing that, we didn't have clean exact lines to build to.
This lead to some confusion where some pieces were laid out in the wrong place and we had to re-cut them when we discovered the problem.
Next time we want to save pattern pieces on a reversed pattern, we'll print a new paper pattern, so we can build to the lines. Maybe even number the pattern prior to printing.
This project is a constant source of joy. It's so fun to work on! Unfortunately, when we install it I'm going to have to stop for a week while we prepare the new pattern on the big table and we have a door panel to rebuild. Both activities require the long table to get them done.
It's great and the weather is cooling off occasionally so the studio is more pleasant.
We made some errors in judgement on this second panel. We wanted to reuse the pattern pieces, which was okay, but we reused the paper pattern by turning it over. By doing that, we didn't have clean exact lines to build to.
This lead to some confusion where some pieces were laid out in the wrong place and we had to re-cut them when we discovered the problem.
Next time we want to save pattern pieces on a reversed pattern, we'll print a new paper pattern, so we can build to the lines. Maybe even number the pattern prior to printing.
This project is a constant source of joy. It's so fun to work on! Unfortunately, when we install it I'm going to have to stop for a week while we prepare the new pattern on the big table and we have a door panel to rebuild. Both activities require the long table to get them done.
It's great and the weather is cooling off occasionally so the studio is more pleasant.
Subscribe to: